(657222) Commissioning Notes
This diagram is for models pre 2022 and R410a models.
- Wire AirTouch 5, gateway and AC indoor as per diagram below and leave the dipswitches on the gateway at their default position. Make sure all wires are connected properly.
- Change mode 10 value to 01 via AC wall controller.
- If AC wall controller is not going to be used after commissioning, change mode 00 value to 01 via AC wall controller. Then remove the AC wall controller.